Construction Management

We stay with the project
until it's built the way it was drawn.

A drawing set describes intent. What actually gets built is the sum of a few hundred small decisions made in the field by people who were never in the design meeting, and most of those are sensible at the time. The ones that cause trouble are the substitutions and sequencing calls that pass code and still miss what the design was counting on. We can pick a project up as early as the budget estimate and the bid documents and stay through commissioning, because catching one of those in week three costs almost nothing next to finding it at energization.

The system you paid for is the system you get, and the drawings on file match what is actually in the building.
Choosing an approach

Who is watching the project on your behalf.

On most jobs nobody decided this. The contractor reports on its own work because the question never came up.

General Contractor Self-Reporting

The GC reports progress as they see it, with no separate engineering review. They judge changes against code, not the design's engineering assumptions.

Fine on a project simple enough that engineering judgment calls are unlikely to come up.
A Non-Technical Owner's Rep

Schedule, budget and coordination handled by someone without an electrical background. Works well on the commercial side of a project, but a substitution can be perfectly code-compliant and still miss what the design was relying on.

Works as long as technical submittals are going to an engineer somewhere else.
An Engineer as Owner's Rep

The same role, filled by an engineer who can read the submittals and judge a field change against the design intent rather than only against code.

What you want when performance hangs on details a GC or a non-technical rep can't evaluate.
How we help

Four points where engineering oversight matters most.

Four points between the first submittal and final sign-off where an engineer needs to be looking.

01
Bid Documents and Award Specifications and bid documents prepared, the pre-bid meeting run, bids opened with you, and a recommendation on award that accounts for what each number actually covers.
02
Field Verification at Key Milestones Site visits timed to the moments where a deviation is still cheap. Before the trench closes, before the equipment is set, before the terminations are made up. After those points the same correction costs ten times as much.
03
Change Order Engineering Review Substitutions and field changes checked against what the design was relying on, not only against code. A breaker with a different interrupting rating passes inspection and quietly breaks your coordination study.
04
As-Built Reconciliation Final documentation that reflects what was actually built, so the next person working on this system isn't relying on outdated drawings.
Engineering Review

Send us the drawings or the spec for the next project.

We review what you send and follow up about where the oversight usually needs to be on work like it.

Request an Engineering Review →

You speak directly with an engineer about your situation and the next step.

  1. 1You send what you have
  2. 2An engineer reads the drawings
  3. 3We tell you where the risk sits